Indian Creek WRF

Madison, GA

 

 

Templeton is proud to have been selected for several pieces of equipment for use on this project. The City of Madison along with Southern Champion, JJG and Templeton and Associates worked together to provide solutions for this project that effectively met the City’s budget.

Some Examples are:

Influent PS - Using 3 50-HP Vaughan Chopper Pumps allowed for first stage screening to be removed from the design, saving both concrete (capital cost) and maintenance.

  Tertiary Filters - Since the SBR had a Post-EQ tank, the Post-EQ pumps could be used to pump to high rate Schreiber tertiary filters, saving both space and capital when compared to conventional filters

Centrifuge Package System - Rather than supplying all of the components of the Centrifuge system separately, the team selected to use a Centrisys, skid mounted centrifuge system. The 200 gpm capacity used unit was purchased used, essentially cutting the price for this system by over 40% while minimizing footprint and providing over 20% cake solids.

Plant Water PS - To save additional capital funds, the plant water pump station design was converted from a horizontal end-suction configuration to a self-priming configuration. This allowed the pumps to be located at grade, saving on excavation and concrete costs.

 

  

                     

 

 

 
 

 